Network surveying instrumentのメーカーや取扱い企業、製品情報、参考価格、ランキングをまとめています。
イプロスは、 製造業 BtoB における情報を集めた国内最大級の技術データベースサイトです。

Network surveying instrument - メーカー・企業と業務用製品 | イプロスものづくり

Network surveying instrumentの製品一覧

1~2 件を表示 / 全 2 件

表示件数

[Example] River Surveying and Plane Surveying

Effective for significant time savings! Introducing examples utilizing network-based RTK.

Kyushu Central Surveying Co., Ltd. introduces a case study utilizing network-based RTK in "river surveying and leveling (reference points)." The company previously tracked the position of boats using a total station. However, by employing "network-based RTK surveying," they installed distance markers and conducted depth surveys using RTK measurements with the mobile station loaded on the boat, significantly improving work efficiency and accuracy. Additionally, since the boat is equipped with a depth sounder, coordinates and depth results are recorded in real-time, allowing for the creation of highly accurate contour and depth maps. 【Benefits and Effects】 ■ Improvement in work efficiency and accuracy ■ Usable in other surveying tasks ■ Effective for significant time savings *For more details, please refer to the PDF document or feel free to contact us.

  • Other network tools
  • Other measurement, recording and measuring instruments
  • Network surveying instrument

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

[Case] Establishment of reference points due to the digitization of road ledgers.

Utilization of network-type RTK in the establishment of reference points due to the digitization of road ledgers!

We would like to introduce a case study utilizing network-type RTK in the "Establishment of Reference Points Accompanying the Digitalization of Road Ledger" by Ariake Surveying Development Co., Ltd. 【Work Details】 ■ Established 70 new points over a total length of 80 km * Network-type RTK involves observations of more than 10 epochs (single point observation method) 【Benefits and Effects】 ■ The conventional ground method using total stations took 30 person-days (3 people × 10 days), whereas in this case, it was completed in 3 person-days (1 person × 3 days). ■ Significant cost reduction was achieved by reducing both working time and manpower. * For more details, please refer to the PDF document or feel free to contact us.

  • Other network tools
  • Other measurement, recording and measuring instruments
  • Network surveying instrument

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録